Plan ahead: Critical P3 parking structure repairs begin May 9

May 3, 2022  //  FOUND IN: Updates & Resources

Please be advised that beginning on Monday, May 9 and lasting approximately 3-4 weeks, a critical repair is scheduled to be made on the Level 2 ramp of the P3 parking structure. 

During this work, up to 20 patient parking spaces are expected to be closed. The space closures will be located on the Level 2 ramp and the Level 1.5 ramp below. Signage will be in place routing traffic around the repair area.  

Please observe posted signage and drive cautiously within the parking structure.

RELATED STORIES