Plan ahead: Asphalt repair program to begin within parking areas next week

August 20, 2020  //  FOUND IN: Updates & Resources

The 2020 asphalt repair program is scheduled to begin within campus parking areas next week. 

Plan ahead if you will be parking in the area.

Please note the following lot impacts:

  • Lots NC84, NC85 and NC86 will be closed for asphalt repairs from 8 p.m. on Friday, Aug. 28 until Sunday, Aug. 30.  Signage will be posted to remove all vehicles.
  • Lot M27 will be closed from 5 p.m. on Saturday, Sept. 5 through Sunday, Sept. 6. Signage will be posted to remove all vehicles.
  • The M48 loading dock will be closed for repairs from Friday, Sept. 4 through Sunday, Sept. 6. During this work, there will be no access to the dock.
  • Scattered concrete, curb and asphalt joint repair (M27 only) will occur in the following areas between Monday, Aug. 24 and Saturday, Aug. 29. Space closures will be limited in the following lots: SC2, SC4, SC6, W32, SC11, M27, M50, M65, M75, M78, NC27, NC78, NC9, NC5, NC24, NC51, NC65, NC96, NC98, NC99, NC103 and M40.

RELATED STORIES